Undertaking involving the construction of the ventilation and smoke extraction system in the stadium for EURO 2004
This stadium was opened on 27 September 2003 with a Rolling Stones concert, where RACE (former SISTAVAC) supplied and installed the HVAC system for the entire stadium and other associated facilities.
This stadium was one of the sports complexes used in the Portuguese organisation for Euro 2014.
Award of contract / Length – 2002 / 6 months
- Installation of a ventilation and smoke extraction system
- Centralized Technical Management
- Associated Electrical Installations