Other projects

Installation of an HVAC system at EUROCAST

HVAC and CTM undertaking at the metal foundry plant in Estarreja

  • Area HVAC
  • Site Estarreja, Portugal
  • Client EUROCAST
  • Description

    Eurocast constructed its second industrial plant in Portugal (Estarreja) with a production area of over 21,000 m2, dedicated to the semi-solid metal casting of aluminium for automobile components. The RACE Centralized Technical Management system controls the entire HVAC system, in addition to being integrated with the following systems: the hydraulic press water cooling system, the air-conditioning monitoring system, the ventilation system, the water pump monitoring systems, the general electricity and generator unit control monitoring systems.

    A major project in the region and another undertaking involving the responsibility of complying with the most demanding standards of national engineering.

    Award of contract / Length – Nov. 2016 / 5 months

    - Installation of an air-conditioning, ventilation and smoke extraction system

    - Centralized Technical Management

    - Monitoring of the performance of the equipment