Ikea Store
Installation of a cooling system and catering equipment
Installation of a cooling system and catering equipment
Installation of a cooling system
HVAC project for the Evora Plaza Shopping Centre
Installation of HVAC system
HVAC and cooling system project using energy for sanitary water heating
HVAC project for the IKEA Loulé Shopping Centre
Installation of a cooling system
Installation of a cooling system
HVAC and CTM undertaking at the metal foundry plant in Estarreja
Installation of BE in the new Arcada Continente
HVAC and cooling system project using anti-condensation energy
Remodeling and expansion of the BLUEPHARMA R&D building
Specialty projects at the Park Lake Shopping Centre in Romania
Installation of a cooling system
Installation of a cooling system
Control solution designed and implemented by RACE
HVAC and smoke extraction system – UTAs & VRV.
Installation of BE in the Camões Building
Ventilation system for the energy production unit and control rooms
Sustained reduction in electricity costs
Installation of an HVAC system at the Alegro Shopping Centre in Setubal
The Senhor do Bonfim Hospitals Complex (HSB) is a private institution dedicated to the provision of healthcare
Integrated consumption management system
Installation of a cooling system
Data Center Portugal Telecom
RACE efficient technology
Empreitada de extração da unidade de produção de papel em Sines
Energy and QAI certification of the IADE building
Installation of an HVAC system at the Hotel Intercontinental in Porto
Installation of an HVAC, smoke extraction and CTM system at Leiria Shopping Centre
HVAC and CTM project
Heating and cooling and ventilation system for Arrabida Hospital
Mechanical Installation at the Vivaci Shopping Centre
Special facilities of the five plants in Viana do Castelo
Ventilation and Smoke Extraction System for the Blue Line Metro Stations
Installation of an HVAC system at Hotel Hilton in Vilamoura
Development and integration of 30 kitchens in the same technical area.
Projecto de AVAC do CC da SONAE SIERRA em Loures
Remodeling of buildings A and D in Alfragide
Undertaking involving the construction of the ventilation and smoke extraction system in the stadium for EURO 2004
Thermal plant for the production of cold water and ice accumulation
Ventilation system in several production lines at the Famalicão plant
Installation of a cooled water distribution unit, HVAC and smoke extraction systems at the Colombo Shopping Centre